top of page

Project 1: Form & Function

Project Statement

This project shows how form and function are dependent on each other and only by taking function in consideration we can have something with a beautiful design.  My bridge focuses on the mechanism of a wrench and the design of a truss bridge.

 

 

The structural bridge will support a pedestrian walkway.  The function, in this case, is the ability of the walkway on the bridge to open, allowing a 30’wide x 40’ object to pass through.
The project will be assessed on structural clarity, functional expression and the creative transformation that takes place.


 

Preliminary Diagrams
Assignement
Jonathon Hulton Bridge
Harbour Bridge
Millau Viaduct
Movement Diagrams
Wrench
Spring Hook
Ball Bearing
3x3 Table
Preliminary Design
Transformation Animation
Final Design
Isometric View
Isometric View 2
Opening Road
Mechanism
Bridge Closed
Bridge Open
Front View
Top and Rear View
Animation of Mecanism
bottom of page